x

*Want to search a historical price chart of products or the lowest ever price? Search for the name of the product or paste the product's link in the search box and hit enter. you will see the product's historical milestone prices, charts, and all current offers with Price History. Do check Amazon Price Tracker and Flipkart Price Tracker for price traking.

Vesgantti 142 inch Modular Sectional Sofa Deep
22nd Sep 2026, 01:56 PM

Vesgantti 142 inch Modular Sectional Sofa, Deep Seat Sleeper Sofabed, White

Price may vary by location, shipping cost, and availability.
Lowest in last 1 year
$999.99

Highest: $1,499.99
Average: $1,401.91
Lowest: $999.99

Should you buy at this price?

Skip
Wait
Okay
Yes

Based our analysis and observation, there is 77.76% chance that the price of Vesgantti 142 inch Modular Sectional Sofa Deep... will increase. Price of product might fluctuate around 3% from current price.*

Price History Graph

Offer Price Prices
Lowest: -
Average: -
Highest: -

Price History Information

You can check the price history of Vesgantti 142 inch Modular Sectional Sofa, Deep Seat Sleeper Sofabed, White here. This product's current Price in USA is $999.99. The average and highest prices are $1,401.91 and $1,499.99 respectively.

Lowest Ever Price $999.99
22nd Sep 2026
Average Price $1,401.91
Based on 503 days price tracking
Highest Price $1,499.99
13th May 2025

Price History of All Variants of Vesgantti 142 inch Modular Sectional Sofa Deep...

Current Price in USA

Price $999.99

Recent Price Drops on Vesgantti 142 inch Modular Sectional Sofa, Deep Seat Sleeper Sofabed, White

Price Drop 21st Sep 2026
$1,099.99 → $999.99
9.09% drop
Price Drop 8th Aug 2026
$1,199.99 → $1,099.99
8.33% drop
Price Drop 21st Jul 2026
$1,199.99 → $1,099.99
8.33% drop
Price Drop 27th Jun 2026
$1,399.99 → $1,199.99
14.29% drop
Price Drop 27th Mar 2026
$1,499.99 → $1,274.99
15% drop

Product Information

Details

Product Name Vesgantti 142 inch Modular Sectional Sofa, Deep Seat Sleeper Sofabed, White
Store Product Code B0F8BLVCD9
Store Name amazon.com
Brand Vesgantti
Rating 10 / 10
Category Sofas & Couches
Product Manufacturer Vesgantti
Model Number Cloud Lita
Color Chenille - Snow White
Size 4 Seater & 4 Ottoman-142" Sofa Bed
Dimensions 60"D x 142"W x 35.5"H

Features

  • Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 56-inch seat depth and 30-inch ottomansignificantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Three adjustable back cushions and four detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyoneideal for extended lounging sessions
  • Fully Modular Design for Customizable Layouts: This modular sofa offers unmatched flexibility, with an overall size of 142"W x 60"D x 35.5"H and seating for 4+ people. You can easily customize the seating arrangement to fit your space and lifestyle. Its rearrangeable components make refreshing the look of your living room effortless, making this cloud sofa both a chic and practical addition to your home. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
  • Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroyboth fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this 5 seater sectional couch will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
  • Two Sets of Sofa Legs & Effortless Assembly: This oversized couch comes with two leg height options2.76" and 4.72"so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
  • Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This big comfy couch will be delivered in 4 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team

Images

×
Image of Vesgantti 142 inch Modular Sectional Sofa, Deep Seat Sleeper Sofabed, White
Image of Vesgantti 142 inch Modular Sectional Sofa, Deep Seat Sleeper Sofabed, White
Image of Vesgantti 142 inch Modular Sectional Sofa, Deep Seat Sleeper Sofabed, White
Image of Vesgantti 142 inch Modular Sectional Sofa, Deep Seat Sleeper Sofabed, White
Image of Vesgantti 142 inch Modular Sectional Sofa, Deep Seat Sleeper Sofabed, White
Image of Vesgantti 142 inch Modular Sectional Sofa, Deep Seat Sleeper Sofabed, White

Rating and Reviews

10 Based on 4 reviews

Vesgantti 142 inch Modular Sectional Sofa Deep has 10 rating out of 10. This average rating is consist of 4 individual ratings. You can rate this product at product review page.

* Predictions is created on based of past prices and trends, it does not guarantee that it will happen. These are just prediction for theoretical information only.