You can check the price history of Vesgantti 108 inch Modular Sectional Sofa here. This product's current Price in USA is $699.99 and the lowest final price is $649.99. The average and highest prices are $703.87 and $750.07 respectively.
Lowest Ever Offer Price
$649.99
2nd Dec 2025
Lowest Ever Price
$699.99
13th May 2025
Average Price
$703.87
Based on 503 days price tracking
Highest Price
$750.07
17th Aug 2025
Current Price in USA
Price
$699.99
Recent Price Drops on Vesgantti 108 inch Modular Sectional Sofa
Price Drop24th Aug 2025
$747.42→$699.99
6.35% drop
Price Drop17th Aug 2025
$750.07→$699.99
6.68% drop
Product Information
Details
Product Name
Vesgantti 108 inch Modular Sectional Sofa
Store Product Code
B0F8BNVXWW
Store Name
amazon.com
Brand
Vesgantti
Rating
7 / 10
Category
Sofas & Couches
Product Manufacturer
Vesgantti
Model Number
Cloud Lita
Color
Chenille - Snow White 1
Size
3 Seater & 1 Ottoman-108" L
Dimensions
60"D x 108"W x 35.5"H
Features
Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 26-inch seat depth and 30-inch ottomansignificantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Three adjustable back cushions and two detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyoneideal for extended lounging sessions
Fully Modular Design for Customizable Layouts: This modular sofa offers unmatched flexibility, with an overall size of 108"W x 60"D x 35.5"H and seating for 24 people. You can easily customize the seating arrangement to fit your space and lifestyle. Its rearrangeable components make refreshing the look of your living room effortless, making this cloud sofa both a chic and practical addition to your home. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroyboth fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this modular couch will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
Two Sets of Sofa Legs & Effortless Assembly: This sectional couch comes with two leg height options2.76" and 4.72"so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This L-shaped couch will be delivered in 2 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team
Images
×
Rating and Reviews
7Based on 3 reviews
Vesgantti 108 inch Modular Sectional Sofa has 7 rating out of 10. This average rating is consist of 3 individual ratings. You can rate this product at product review page.
* Predictions is created on based of past prices and trends, it does not guarantee that it will happen. These are just prediction for theoretical information only.