You can check the price history of Vesgantti V Shaped Sectional Couch with Ottoman Chenille for Living Room, Bedroom and Apartment, Khaki Brown here. This product's current Price in USA is $1,199.99. The average and highest prices are $1,199.99 and $1,199.99 respectively.
Lowest Ever Price
$1,199.99
20th Feb 2026
Average Price
$1,199.99
Based on 220 days price tracking
Highest Price
$1,199.99
20th Feb 2026
Current Price in USA
Price
$1,199.99
Product Information
Details
Product Name
Vesgantti V Shaped Sectional Couch with Ottoman Chenille for Living Room, Bedroom and Apartment, Khaki Brown
Store Product Code
B0GNSM7LQW
Store Name
amazon.com
Brand
Vesgantti
Rating
8 / 10
Category
Sofas & Couches
Product Manufacturer
Vesgantti
Color
Chenille - Dark Brown
Size
V Shaped
Dimensions
108"D x 108"W x 35.5"H
Features
Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 56-inch seat depth and 30-inch ottomansignificantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Three adjustable back cushions and four detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyoneideal for extended lounging sessions
Fully Modular Design for Customizable Layouts: This modular sofa offers unmatched flexibility, with an overall size of 101"W x 101"D x 35.5"H and seating for 5+ people. You can easily customize the seating arrangement to fit your space and lifestyle. Its rearrangeable components make refreshing the look of your living room effortless, making this cloud sofa both a chic and practical addition to your home. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroyboth fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this 5 seater sectional couch will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
Two Sets of Sofa Legs & Effortless Assembly: This oversized couch comes with two leg height options2.76" and 4.72"so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This big comfy couch will be delivered in 4 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team
Images
×
Rating and Reviews
8Based on 15 reviews
Vesgantti V Shaped Sectional Couch with Ottoman has 8 rating out of 10. This average rating is consist of 15 individual ratings. You can rate this product at product review page.
* Predictions is created on based of past prices and trends, it does not guarantee that it will happen. These are just prediction for theoretical information only.