x

*Want to search a historical price chart of products or the lowest ever price? Search for the name of the product or paste the product's link in the search box and hit enter. you will see the product's historical milestone prices, charts, and all current offers with Price History. Do check Amazon Price Tracker and Flipkart Price Tracker for price traking.

Vesgantti 114 inch U Shaped Boneless Couch
12th May 2026, 09:05 PM

Vesgantti 114 inch U Shaped Boneless Couch, Modular Sectional Sofa, Dark Brown

Price may vary by location, shipping cost, and availability.
33% Off
$399.99
$599.99

Highest: $699.99
Average: $504.77
Lowest: $359.99

Price History Graph

Offer Price Prices
Lowest: -
Average: -
Highest: -

Price History Information

You can check the price history of Vesgantti 114 inch U Shaped Boneless Couch, Modular Sectional Sofa, Dark Brown here. This product's current Price in USA is $399.99. The average and highest prices are $504.77 and $699.99 respectively.

Lowest Ever Price $359.99
22nd Apr 2026
Average Price $504.77
Based on 212 days price tracking
Highest Price $699.99
11th Feb 2026

Price History of All Variants of Vesgantti 114 inch U Shaped Boneless Couch...

Current Price in USA

Price $399.99
MRP $599.99
Savings $200.00
Discount 33.33%

Recent Price Drops on Vesgantti 114 inch U Shaped Boneless Couch, Modular Sectional Sofa, Dark Brown

Price Drop 11th May 2026
$499.99 $399.99
20% drop
Price Drop 21st Apr 2026
$379.99 $359.99
5.26% drop
Price Drop 13th Apr 2026
$399.99 $379.99
5% drop
Price Drop 3rd Apr 2026
$459.99 $399.99
13.04% drop
Price Drop 24th Mar 2026
$474.99 $424.99
10.53% drop
Price Drop 21st Mar 2026
$599.99 $474.99
20.83% drop
Price Drop 11th Mar 2026
$599.99 $499.99
16.67% drop
Price Drop 9th Mar 2026
$699.99 $599.99
14.29% drop

Product Information

Details

Product Name Vesgantti 114 inch U Shaped Boneless Couch, Modular Sectional Sofa, Dark Brown
Store Product Code B0GMQ5C3QQ
Store Name amazon.com
Brand Vesgantti
Rating 10 / 10
Category Sofas & Couches
Product Manufacturer Vesgantti
Color Dark Brown
Size 3 Seater & 2 Ottoman
Dimensions 66.9"D x 114"W x 31.5"H

Features

  • Flexible Modular Design: The U shaped sectional sofa has 5 separate sections. Each module can be easily moved and reassembled into loveseat, L shaped or U shaped sofa, chaise lounge, sleeper sofa, or oversized family sectional couch to match your lifestyle. The modular design allows you to freely create your ideal layout and adapt to ever-changing spaces. All modular seats have a anti-slip design on the bottom to prevent the sofa from sliding during daily use
  • Spacious & Comfortable: The 114 inch modular sofa features 31.5 inch width and 29.5 inch deep seats, providing ample seating space to lounge for you and your family, especially perfert for heavy people. 9.8 inch wide armrests is an ideal place for placing drinks or laptop. The setional couch can easily transforms any room into a warm and comfortable haven for relaxing, entertaining guests, or enjoying a family movie night
  • Durable and Long-lasting Support: This modern sofa is crafted entirely from high-resilience foam, providing lasting support and ultimate comfort. The foam utilizes quick rebound technology, maintaining its shape after prolonged use while providing a comfortable and stable seat. This full foam couch is perfect for a living room, bedroom, office, apartment, guest rooms, and children's play areas, encouraging children to play on its luxurious surface
  • Premium Chenille Fabric: The modular sectional sofa is made of high-quality chenille fabric, which is soft, pill-resistant and pet-friendly; ensuring long-term durability and making it perfect for daily use. The stylish and solid color design adds a touch of luxury and enhances the beauty of your living space. We have a variety of colors for option to meet different decoration styles (Note: Colors may vary slightly due to lighting or monitor settings)
  • No Assembly Required: No tools or complicated setup are required. Our modular couch is vacuum-packed; just simply unpack, gently pat the sections, and wait 72 hours for fully expand. Ultimate comfort and convenience are at your fingertips. The boneless sofa is packaged in 2 boxes, which may arrive on different days. Before assembling, please check all packages. If you have any questions or are dissatisfied with our sofa, please feel free to contact us

Images

×
Image of Vesgantti 114 inch U Shaped Boneless Couch, Modular Sectional Sofa, Dark Brown
Image of Vesgantti 114 inch U Shaped Boneless Couch, Modular Sectional Sofa, Dark Brown
Image of Vesgantti 114 inch U Shaped Boneless Couch, Modular Sectional Sofa, Dark Brown
Image of Vesgantti 114 inch U Shaped Boneless Couch, Modular Sectional Sofa, Dark Brown
Image of Vesgantti 114 inch U Shaped Boneless Couch, Modular Sectional Sofa, Dark Brown
Image of Vesgantti 114 inch U Shaped Boneless Couch, Modular Sectional Sofa, Dark Brown

Rating and Reviews

10 Based on 5 reviews

Vesgantti 114 inch U Shaped Boneless Couch has 10 rating out of 10. This average rating is consist of 5 individual ratings. You can rate this product at product review page.

* Predictions is created on based of past prices and trends, it does not guarantee that it will happen. These are just prediction for theoretical information only.