x

*Want to search a historical price chart of products or the lowest ever price? Search for the name of the product or paste the product's link in the search box and hit enter. you will see the product's historical milestone prices, charts, and all current offers with Price History. Do check Amazon Price Tracker and Flipkart Price Tracker for price traking.

Vesgantti 100 inch Boneless Couches for Living
25th Jun 2026, 02:50 AM

Vesgantti 100 inch Boneless Couches for Living Room, No Assembly Required, Snow White

Price may vary by location, shipping cost, and availability.
74% Off
$131.98
$499.99

Highest: $132.46
Average: $130.40
Lowest: $129.99

Price History Graph

Offer Price Prices
Lowest: -
Average: -
Highest: -

Price History Information

You can check the price history of Vesgantti 100 inch Boneless Couches for Living Room, No Assembly Required, Snow White here. This product's current Price in USA is $131.98. The average and highest prices are $130.40 and $132.46 respectively.

Lowest Ever Price $129.99
23rd Mar 2026
Average Price $130.40
Based on 171 days price tracking
Highest Price $132.46
17th Jun 2026

Current Price in USA

Price $131.98
MRP $499.99
Savings $368.01
Discount 73.60%

Product Information

Details

Product Name Vesgantti 100 inch Boneless Couches for Living Room, No Assembly Required, Snow White
Store Product Code B0FWC67V5T
Store Name amazon.com
Brand Vesgantti
Rating 8 / 10
Category Sofas & Couches
Color Snow White
Size Single
Dimensions 33.5"D x 30.7"W x 30.7"H

Features

  • Generously Sized SeatingThis deep seat couch is crafted with oversized dimensions to be your big comfy couch. Spanning 118 wide, the oversized couch easily fits 34 people without crowding. Boasting a 25 deep seat for solid lumbar support and a 32 seat height to cradle your neck and back, it offers all-day cozy relaxation. Stretch out, lounge or unwind freely, sink into the spacious cushions to release daily stress and enjoy long-lasting soothing comfort every day.
  • Cloud-Like Comfort: Youll experience unmatched relaxation on our foam couch. Unlike traditional sofas, our boneless cloud sofa features a second seat cushion filled with shredded foam. This high-quality fluffy couch delivers an incredibly deep, soft, and enveloping sitting feel. Sink freely into the plush cushions while watching movies or stretching your body. Your body is steadily and softly cradled, letting you release all stress and enjoy a soothing cloud-floating feeling at any moment.
  • Plush & Supportive: Our cloud couch perfectly balances plush softness and solid support by combining high-resilience foam with premium springs. This practical living room couch features adaptive dense foam that fits and hugs your body for cozy lounging. Reinforced sturdy spring structures greatly enhance durability, so this reliable floor couch never sags even when kids jump and play. It maintains consistent cushion performance all the time, offering you long-term, premium daily seating comfort.
  • Premium Corduroy Fabric: This corduroy couch features long-pile corduroy that combines exceptional durability with an ultra-soft feel. This comfy couch crafted from heavy-weight, thickened fabric, it effectively withstands daily wear and tear, minor scratches, pilling, and deformation. The surface boasts a rich, fine pile that is gentle against the skin and resistant to dust accumulation; simply wiping with a damp cloth easily removes pet hair, saving you from tedious cleaning chores.

Images

×
Image of Vesgantti 100 inch Boneless Couches for Living Room, No Assembly Required, Snow White
Image of Vesgantti 100 inch Boneless Couches for Living Room, No Assembly Required, Snow White

Rating and Reviews

8 Based on 15 reviews

Vesgantti 100 inch Boneless Couches for Living has 8 rating out of 10. This average rating is consist of 15 individual ratings. You can rate this product at product review page.

* Predictions is created on based of past prices and trends, it does not guarantee that it will happen. These are just prediction for theoretical information only.