x

*Want to search a historical price chart of products or the lowest ever price? Search for the name of the product or paste the product's link in the search box and hit enter. you will see the product's historical milestone prices, charts, and all current offers with Price History. Do check Amazon Price Tracker and Flipkart Price Tracker for price traking.

Vesgantti 143 inch Modular Couch Modern 7
21st May 2026, 06:49 AM

Vesgantti 143 inch Modular Couch, Modern 7 Seater Sofa Couches for Living Room, No Assembly Required, Beige White

Price may vary by location, shipping cost, and availability.
Lowest in last 6 months
17% Off
$498.95
$599.99

Highest: $1,199.99
Average: $1,028.63
Lowest: $498.95

Should you buy at this price?

Skip
Wait
Okay
Yes

Based our analysis and observation, there is 85.00% chance that the price of Vesgantti 143 inch Modular Couch Modern 7... will increase. Price of product might fluctuate around 3% from current price.*

Price History Graph

Offer Price Prices
Lowest: -
Average: -
Highest: -

Price History Information

You can check the price history of Vesgantti 143 inch Modular Couch, Modern 7 Seater Sofa Couches for Living Room, No Assembly Required, Beige White here. This product's current Price in USA is $498.95. The average and highest prices are $1,028.63 and $1,199.99 respectively.

Lowest Ever Price $498.95
21st May 2026
Average Price $1,028.63
Based on 222 days price tracking
Highest Price $1,199.99
9th Nov 2025

Current Price in USA

Price $498.95
MRP $599.99
Savings $101.04
Discount 16.84%

Recent Price Drops on Vesgantti 143 inch Modular Couch, Modern 7 Seater Sofa Couches for Living Room, No Assembly Required, Beige White

Price Drop 20th May 2026
$558.35 $498.95
10.64% drop
Price Drop 1st May 2026
$653.39 $558.35
14.55% drop
Price Drop 11th Apr 2026
$700.91 $653.39
6.78% drop
Price Drop 8th Apr 2026
$748.43 $700.91
6.35% drop
Price Drop 30th Mar 2026
$795.95 $748.43
5.97% drop
Price Drop 20th Mar 2026
$926.63 $795.95
14.1% drop
Price Drop 10th Feb 2026
$1,199.99 $997.91
16.84% drop
Price Drop 17th Jan 2026
$1,199.99 $1,079.99
10% drop
Price Drop 19th Nov 2025
$1,199.99 $1,019.99
15% drop

Product Information

Details

Product Name Vesgantti 143 inch Modular Couch, Modern 7 Seater Sofa Couches for Living Room, No Assembly Required, Beige White
Store Product Code B0G12SLMGG
Store Name amazon.com
Brand Vesgantti
Rating 5.8 / 10
Category Sofas & Couches
Product Manufacturer Vesgantti
Color Beige White
Size 6 Seater
Dimensions 112.2"D x 143.7"W x 31.5"H

Features

  • Flexible Modular Design: The Oversized sectional sofa has 6 separate sections
  • Spacious & Comfortable: The 143.7 inch modular couch features 31.5 inch width and 29.5 inch deep seats, providing ample seating space to lounge for you and your family
  • Durable and Long-lasting Support: This modern couch is crafted entirely from high-resilience foam, providing lasting support and ultimate comfort
  • Premium Chenille Fabric: The modular sectional Couch is made of high-quality chenille fabric, which is soft, pill-resistant and pet-friendly
  • No Assembly Required: No tools or complicated setup are required

Images

×
Image of Vesgantti 143 inch Modular Couch, Modern 7 Seater Sofa Couches for Living Room, No Assembly Required, Beige White
Image of Vesgantti 143 inch Modular Couch, Modern 7 Seater Sofa Couches for Living Room, No Assembly Required, Beige White

Rating and Reviews

5.8 Based on 5 reviews

Vesgantti 143 inch Modular Couch Modern 7 has 5.8 rating out of 10. This average rating is consist of 5 individual ratings. You can rate this product at product review page.

* Predictions is created on based of past prices and trends, it does not guarantee that it will happen. These are just prediction for theoretical information only.