x

*Want to search a historical price chart of products or the lowest ever price? Search for the name of the product or paste the product's link in the search box and hit enter. you will see the product's historical milestone prices, charts, and all current offers with Price History. Do check Amazon Price Tracker and Flipkart Price Tracker for price traking.

Set of 2 Pet GPS Tracker -
4th Apr 2026, 05:59 PM

Set of 2 Pet GPS Tracker - Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible - iOS & Android (Subscription Required)

Price may vary by location, shipping cost, and availability.
0% Off
$42.95
$42.95

Highest: $42.95
Average: $42.30
Lowest: $38.66
Lowest Offer: $36.73

Should you buy at this price?

Skip
Wait
Okay
Yes

Based our analysis and observation, there is 30.71% chance that the price of Set of 2 Pet GPS Tracker -... will increase. Price of product might fluctuate between 2% and 6% of current price.*

Price History Graph

Offer Price Prices
Lowest: -
Average: -
Highest: -

Price History Information

You can check the price history of Set of 2 Pet GPS Tracker - Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible - iOS & Android (Subscription Required) here. This product's current Price in USA is $42.95 and the lowest final price is $36.73. The average and highest prices are $42.30 and $42.95 respectively.

Lowest Ever Offer Price $36.73
1st Feb 2026
Lowest Ever Price $38.66
1st Feb 2026
Average Price $42.30
Based on 176 days price tracking
Highest Price $42.95
20th Nov 2025

Price History of All Variants of Set of 2 Pet GPS Tracker -...

Current Price in USA

Price $42.95
MRP $42.95
Savings $0.00
Discount 0%

Recent Price Drops on Set of 2 Pet GPS Tracker - Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible - iOS & Android (Subscription Required)

Price Drop 20th Mar 2026
$42.95 $40.80
5.01% drop
Price Drop 31st Jan 2026
$42.95 $38.66
9.99% drop
Offer Price Drop 31st Jan 2026
$40.80 $36.73
9.99% drop
Offers: 5% Coupon

Product Information

Details

Product Name Set of 2 Pet GPS Tracker - Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible - iOS & Android (Subscription Required)
Store Product Code B0FV13SRPK
Store Name amazon.com
Brand PETLOC8
Rating 7.6 / 10
Category Location Trackers
Product Manufacturer PETLOC8
Model Number Cat Tracker
Color Set of 2 Dog & Cat Tracker - Subscription Required

Features

  • This Device Requires a Subscription. To start using it, simply select the flexible and transparent tariff plan that best fits your needs. Check the product gallery to see the tariff plans.
  • NEVER LOSE YOUR CAT Works Anywhere With 4G Sim - Real-time GPS tracking shows your cats exact location anytime, anywhere. iOS & Android app.
  • ULTRA-SMALL & LIGHTWEIGHT The smallest waterproof tracker for cats, designed to be collar-compatible and comfortable for daily wear.
  • SMART ALERTS & GEO-FENCE Get instant notifications if your cat leaves a safe zone.
  • LONG-LIFE RECHARGEABLE BATTERY Up to 14 days on a single charge for worry-free protection.

Images

×
Image of Set of 2 Pet GPS Tracker - Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible - iOS & Android (Subscription Required)
Image of Set of 2 Pet GPS Tracker - Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible - iOS & Android (Subscription Required)
Image of Set of 2 Pet GPS Tracker - Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible - iOS & Android (Subscription Required)
Image of Set of 2 Pet GPS Tracker - Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible - iOS & Android (Subscription Required)
Image of Set of 2 Pet GPS Tracker - Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible - iOS & Android (Subscription Required)
Image of Set of 2 Pet GPS Tracker - Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible - iOS & Android (Subscription Required)

Rating and Reviews

7.6 Based on 383 reviews

Set of 2 Pet GPS Tracker - has 7.6 rating out of 10. This average rating is consist of 383 individual ratings. You can rate this product at product review page.

* Predictions is created on based of past prices and trends, it does not guarantee that it will happen. These are just prediction for theoretical information only.