x

*Want to search a historical price chart of products or the lowest ever price? Search for the name of the product or paste the product's link in the search box and hit enter. you will see the product's historical milestone prices, charts, and all current offers with Price History. Do check Amazon Price Tracker and Flipkart Price Tracker for price traking.

Dog GPS Tracker - Real-Time Location Tracking
9th May 2026, 12:23 PM

Dog GPS Tracker - Real-Time Location Tracking Device with App - Smart Alerts & Geo-Fence - Collar-Compatible, Waterproof - Long-Life Battery - iOS & Android (12-Mo Subscription Included)

Price may vary by location, shipping cost, and availability.
Highest: $99.99
Average: $97.41
Lowest: $88.95
Lowest Offer: $85.46

Should you buy at this price?

Skip
Wait
Okay
Yes

Based our analysis and observation, there is 56.10% chance that the price of Dog GPS Tracker - Real-Time Location Tracking... will increase. Price of product might fluctuate between 19% and 23% of current price.*

Price History Graph

Offer Price Prices
Lowest: -
Average: -
Highest: -

Price History Information

You can check the price history of Dog GPS Tracker - Real-Time Location Tracking Device with App - Smart Alerts & Geo-Fence - Collar-Compatible, Waterproof - Long-Life Battery - iOS & Android (12-Mo Subscription Included) here. This product's current Price in USA is $99.95 and the lowest final price is $85.46. The average and highest prices are $97.41 and $99.99 respectively.

Lowest Ever Offer Price $85.46
30th Jan 2026
Lowest Ever Price $88.95
25th Sep 2025
Average Price $97.41
Based on 314 days price tracking
Highest Price $99.99
5th Jul 2025

Price History of All Variants of Dog GPS Tracker - Real-Time Location Tracking...

Current Price in USA

Price $99.95

Recent Price Drops on Dog GPS Tracker - Real-Time Location Tracking Device with App - Smart Alerts & Geo-Fence - Collar-Compatible, Waterproof - Long-Life Battery - iOS & Android (12-Mo Subscription Included)

Price Drop 14th Apr 2026
$99.95 $94.95
5% drop
Price Drop 29th Jan 2026
$99.95 $89.96
9.99% drop
Price Drop 24th Sep 2025
$98.95 $88.95
10.11% drop

Product Information

Details

Product Name Dog GPS Tracker - Real-Time Location Tracking Device with App - Smart Alerts & Geo-Fence - Collar-Compatible, Waterproof - Long-Life Battery - iOS & Android (12-Mo Subscription Included)
Store Product Code B0FF9QWQR7
Store Name amazon.com
Brand PETLOC8
Rating 7.6 / 10
Category Location Trackers
Product Manufacturer PETLOC8
Model Number Dog - 12 Months Included
Color Dog Tracker - 12 Months Included

Features

  • Real-time GPS tracking keeps your dog safe know their exact location anytime through the Petloc8 app.
  • Smart alerts and custom Geo-Fence zones notify you instantly if your pet wanders too far.
  • Built-in pet owner community lets family & friends monitor your dogs safety too free and instant.
  • Lightweight & waterproof design (IP67) makes it perfect for daily adventures rain or shine. Ideal for active dogs, pet sitters, or escape artists perfect for hiking, traveling, and everyday walks.
  • Up to 14-day battery life means fewer charges and more peace of mind.

Images

×
Image of Dog GPS Tracker - Real-Time Location Tracking Device with App - Smart Alerts & Geo-Fence - Collar-Compatible, Waterproof - Long-Life Battery - iOS & Android (12-Mo Subscription Included)
Image of Dog GPS Tracker - Real-Time Location Tracking Device with App - Smart Alerts & Geo-Fence - Collar-Compatible, Waterproof - Long-Life Battery - iOS & Android (12-Mo Subscription Included)
Image of Dog GPS Tracker - Real-Time Location Tracking Device with App - Smart Alerts & Geo-Fence - Collar-Compatible, Waterproof - Long-Life Battery - iOS & Android (12-Mo Subscription Included)
Image of Dog GPS Tracker - Real-Time Location Tracking Device with App - Smart Alerts & Geo-Fence - Collar-Compatible, Waterproof - Long-Life Battery - iOS & Android (12-Mo Subscription Included)
Image of Dog GPS Tracker - Real-Time Location Tracking Device with App - Smart Alerts & Geo-Fence - Collar-Compatible, Waterproof - Long-Life Battery - iOS & Android (12-Mo Subscription Included)
Image of Dog GPS Tracker - Real-Time Location Tracking Device with App - Smart Alerts & Geo-Fence - Collar-Compatible, Waterproof - Long-Life Battery - iOS & Android (12-Mo Subscription Included)

Rating and Reviews

7.6 Based on 404 reviews

Dog GPS Tracker - Real-Time Location Tracking has 7.6 rating out of 10. This average rating is consist of 404 individual ratings. You can rate this product at product review page.

* Predictions is created on based of past prices and trends, it does not guarantee that it will happen. These are just prediction for theoretical information only.