x

*Want to search a historical price chart of products or the lowest ever price? Search for the name of the product or paste the product's link in the search box and hit enter. you will see the product's historical milestone prices, charts, and all current offers with Price History. Do check Amazon Price Tracker and Flipkart Price Tracker for price traking.

Vesgantti 169 inch U Shaped Sectional Modular
6th Sep 2026, 07:40 AM

Vesgantti 169 inch U Shaped Sectional Modular Couch, Comfy Cloud Sofa, Beige

Price may vary by location, shipping cost, and availability.
Lowest ever
$999.99

Highest: $999.99
Average: $999.99
Lowest: $999.99

Price History Graph

Offer Price Prices
Lowest: -
Average: -
Highest: -

Price History Information

You can check the price history of Vesgantti 169 inch U Shaped Sectional Modular Couch, Comfy Cloud Sofa, Beige here. This product's current Price in USA is $999.99. The average and highest prices are $999.99 and $999.99 respectively.

Lowest Ever Price $999.99
27th Aug 2026
Average Price $999.99
Based on 14 days price tracking
Highest Price $999.99
27th Aug 2026

Current Price in USA

Price $999.99

Product Information

Details

Product Name Vesgantti 169 inch U Shaped Sectional Modular Couch, Comfy Cloud Sofa, Beige
Store Product Code B0HG18ZZVW
Store Name amazon.com
Brand Vesgantti
Rating 8.8 / 10
Category Sofas & Couches
Color Beige
Size 6 Seater & 2 Ottoman-169" U
Dimensions 101"D x 135"W x 35.5"H

Features

  • Spacious and Comfortable Seating: Our 108 inch oversized L-shaped couch features 26 inch deep seating area and 30 inch ottoman, creating a ample leisure space for you and your family. This cloud couch is designed with double-layered high-resilience foam seat cushions, thick back cushions, and 2 armrests pillows, providing ergonomic support for your waist and back. The extremely soft seat cushions make you feel like you're in the clouds, making the sofa an ideal choice for relaxation
  • Premium Corduroy Fabric: The modular sofa is upholstered in wrinkle-resistant & soft corduroy fabric, which feels silky soft to touch. The impressive durability and stain-fighting prowess of corduroy fabric keep your sectional sofas looking fresh and lively, perfet for homes with children or pets. We have multiple colors for option to match different decoration styles for fully meeting your personalized needs. Tips: There may be slight color difference due to light or display reasons
  • Convertible Modular Sectional Sofa: This modular couches feature a movable ottoman for flexible switching that you create an left facing or right facing L-shaped modular sofa, or comfortable sectional sofa. The versatile cloud couch allows you to customize the layout to fit your space and lifestyle. The simple solid color design makes this sofa to easily blend into different decoration style and occasions, whether it's the living room, bedroom, office and children's play areas
  • Easy Assembly and Disassembly: This 108'' L shaped sofa will be delivered in 2 boxes and easily carried. Before assembly, please check all parts. You can complete the installation in 30 minutes by following the included detailed instructions. The sectional modular couch is also easy to disassemblec and carry if you would move to a new place. Note: The cushions and pillows are vacuum-packed. After unpacking, please fluff them thoroughly, it may take 48-72 hours for fully expand
  • Stable Structure and Reliable Customer Service: The frames (armrests, backrests, seat frames) of sectional sofas are made of wood, making them more stable, durable, and load-bearing capacity is stronger than other products. Secure screw-on connections keep each part firmly in place, ensuring stability while making them suitable for a variety of body types. If you are not satisfied with the sofa you received, please feel free to contact our customer service team

Images

×
Image of Vesgantti 169 inch U Shaped Sectional Modular Couch, Comfy Cloud Sofa, Beige
Image of Vesgantti 169 inch U Shaped Sectional Modular Couch, Comfy Cloud Sofa, Beige
Image of Vesgantti 169 inch U Shaped Sectional Modular Couch, Comfy Cloud Sofa, Beige
Image of Vesgantti 169 inch U Shaped Sectional Modular Couch, Comfy Cloud Sofa, Beige
Image of Vesgantti 169 inch U Shaped Sectional Modular Couch, Comfy Cloud Sofa, Beige
Image of Vesgantti 169 inch U Shaped Sectional Modular Couch, Comfy Cloud Sofa, Beige

Rating and Reviews

8.8 Based on 39 reviews

Vesgantti 169 inch U Shaped Sectional Modular has 8.8 rating out of 10. This average rating is consist of 39 individual ratings. You can rate this product at product review page.

* Predictions is created on based of past prices and trends, it does not guarantee that it will happen. These are just prediction for theoretical information only.