x

*Want to search a historical price chart of products or the lowest ever price? Search for the name of the product or paste the product's link in the search box and hit enter. you will see the product's historical milestone prices, charts, and all current offers with Price History. Do check Amazon Price Tracker and Flipkart Price Tracker for price traking.

EVM EnWifi 600Mbps Dual Band USB WiFi
1st Apr 2026, 05:44 AM

EVM EnWifi 600Mbps Dual Band USB WiFi Adapter - 2.4GHz + 5GHz, 802.11ac, High-Gain Antenna, Windows 11 /10 /Mac | 1 Year Warranty

Price may vary by location, shipping cost, and availability.
66% Off
₹679
₹1,999

Highest: ₹699
Average: ₹646
Lowest: ₹599

Should you buy at this price?

Skip
Wait
Okay
Yes

Based our analysis and observation, there is very negligible chances of price to increase or decrease, more likely ro remain constant based on our price historical data.*

Price History Graph

Offer Price Prices
Lowest: -
Average: -
Highest: -

Price History Information

You can check the price history of EVM EnWifi 600Mbps Dual Band USB WiFi Adapter - 2.4GHz + 5GHz, 802.11ac, High-Gain Antenna, Windows 11 /10 /Mac | 1 Year Warranty here. This product's current Price in India is ₹679. The average and highest prices are ₹646 and ₹699 respectively.

Lowest Ever Price ₹599
15th Nov 2024
Average Price ₹646
Based on 506 days price tracking
Highest Price ₹699
29th Oct 2025

Current Price in India

Price ₹679
MRP ₹1,999
Savings ₹1,320
Discount 66.03%

Recent Price Drops on EVM EnWifi 600Mbps Dual Band USB WiFi Adapter - 2.4GHz + 5GHz, 802.11ac, High-Gain Antenna, Windows 11 /10 /Mac | 1 Year Warranty

Price Drop 1st Oct 2025
₹649 ₹599
7.7% drop
Price Drop 20th Sep 2025
₹649 ₹599
7.7% drop

Product Information

Details

Product Name EVM EnWifi 600Mbps Dual Band USB WiFi Adapter - 2.4GHz + 5GHz, 802.11ac, High-Gain Antenna, Windows 11 /10 /Mac | 1 Year Warranty
Store Product Code B0DKP12VZV
Store Name amazon.in
Brand EVM
Rating 8 / 10
Category Wireless USB Adapters
Product Manufacturer EVM
Dimensions 20L x 160W x 300H Millimeters
Country of Origin China

Features

  • Dual Band WiFi Adapter 2.4GHz & 5GHz Wireless Connectivity This dual band USB WiFi adapter supports both 2.4GHz and 5GHz WiFi networks, allowing users to switch between stable long-range connectivity and faster high-speed internet, making it a reliable USB WiFi adapter for PC and laptop.
  • High Speed 600Mbps Wireless Performance Fast USB WiFi Dongle The 600Mbps USB wireless network adapter delivers smooth performance for HD video streaming, online gaming, video calls and large file downloads, providing faster internet speeds compared to standard USB WiFi adapters.
  • External High Gain Antenna Strong Signal WiFi Adapter Equipped with an external high-gain antenna, this USB WiFi dongle with antenna enhances signal strength, reception and wireless coverage, ensuring stable connectivity even in large homes or office environments.
  • Advanced 802.11ac Technology Next-Generation Wireless Adapter Powered by 802.11ac WiFi technology, this AC600 USB WiFi adapter offers faster data transfer, reduced latency and improved wireless efficiency, making it ideal for high-bandwidth internet activities.
  • Wide Compatibility USB WiFi Adapter for Windows & Mac This USB wireless network adapter for laptop and desktop works seamlessly with Windows PCs and Mac systems, offering easy installation and dependable connectivity backed by 1 Year EVM Warranty.

Images

×
Image of EVM EnWifi 600Mbps Dual Band USB WiFi Adapter - 2.4GHz + 5GHz, 802.11ac, High-Gain Antenna, Windows 11 /10 /Mac | 1 Year Warranty
Image of EVM EnWifi 600Mbps Dual Band USB WiFi Adapter - 2.4GHz + 5GHz, 802.11ac, High-Gain Antenna, Windows 11 /10 /Mac | 1 Year Warranty
Image of EVM EnWifi 600Mbps Dual Band USB WiFi Adapter - 2.4GHz + 5GHz, 802.11ac, High-Gain Antenna, Windows 11 /10 /Mac | 1 Year Warranty
Image of EVM EnWifi 600Mbps Dual Band USB WiFi Adapter - 2.4GHz + 5GHz, 802.11ac, High-Gain Antenna, Windows 11 /10 /Mac | 1 Year Warranty
Image of EVM EnWifi 600Mbps Dual Band USB WiFi Adapter - 2.4GHz + 5GHz, 802.11ac, High-Gain Antenna, Windows 11 /10 /Mac | 1 Year Warranty

Rating and Reviews

8 Based on 37 reviews

EVM EnWifi 600Mbps Dual Band USB WiFi has 8 rating out of 10. This average rating is consist of 37 individual ratings. You can rate this product at product review page.

* Predictions is created on based of past prices and trends, it does not guarantee that it will happen. These are just prediction for theoretical information only.