You can check the price history of WHITIN Men's Slip-on Minimalist Barefoot Shoes | Zero Drop Sole | Wide Toe Box here. This product's current Price in USA is $19.99. The average and highest prices are $28.52 and $41.99 respectively.
Lowest Ever Price
$19.99
23rd Sep 2025
Average Price
$28.52
Based on 547 days price tracking
Highest Price
$41.99
8th Apr 2025
Current Price in USA
Price
$19.99
Recent Price Drops on WHITIN Men's Slip-on Minimalist Barefoot Shoes | Zero Drop Sole | Wide Toe Box
Price Drop13th Nov 2025
$39.99→$19.99
50.01% drop
Price Drop20th Oct 2025
$29.99→$19.99
33.34% drop
Price Drop16th Oct 2025
$25.99→$19.99
23.09% drop
Price Drop8th Oct 2025
$29.99→$25.99
13.34% drop
Price Drop22nd Sep 2025
$29.99→$19.99
33.34% drop
Price Drop4th May 2025
$39.99→$29.99
25.01% drop
Product Information
Details
Product Name
WHITIN Men's Slip-on Minimalist Barefoot Shoes | Zero Drop Sole | Wide Toe Box
Store Product Code
B0DX9PX49C
Store Name
amazon.com
Brand
WHITIN
Rating
8.8 / 10
Category
Walking
Color
Light Grey
Features
Combining durable canvas with stretch knit creates a lightweight and flexible design
Wider toe box lets your feet and toes spread out for stabilitylghtweight enough to believe you're actually barefoot
The zero drop sole respects the foots natural position and promotes increased balance and stability
Slip-on relaxed fit design let you enjoy longer walks with comfort
The rubber outsoles promote ninja-like performance in slippery places
Images
×
Rating and Reviews
8.8Based on 172 reviews
WHITIN Mens Slip-on Minimalist Barefoot Shoes has 8.8 rating out of 10. This average rating is consist of 172 individual ratings. You can rate this product at product review page.
* Predictions is created on based of past prices and trends, it does not guarantee that it will happen. These are just prediction for theoretical information only.