x

*Want to search a historical price chart of products or the lowest ever price? Search for the name of the product or paste the product's link in the search box and hit enter. you will see the product's historical milestone prices, charts, and all current offers with Price History. Do check Amazon Price Tracker and Flipkart Price Tracker for price traking.

Vesgantti Large Ottoman for Modular Sofa 29.5
8th Jul 2026, 12:37 PM

Vesgantti Large Ottoman for Modular Sofa, 29.5 inch Corduroy Ottoman with Spring Cushion, Rectangle Foot Rest for Couch, Entrance Footstool with Wood Legs, Footstool for Living Room, Bedroom, Dark Gray

Price may vary by location, shipping cost, and availability.
Lowest ever
5% Off
$89.99
$99.99

+ $5
Highest: $89.99
Average: $89.99
Lowest: $89.99

Price History Graph

Offer Price Prices
Lowest: -
Average: -
Highest: -

Price History Information

You can check the price history of Vesgantti Large Ottoman for Modular Sofa, 29.5 inch Corduroy Ottoman with Spring Cushion, Rectangle Foot Rest for Couch, Entrance Footstool with Wood Legs, Footstool for Living Room, Bedroom, Dark Gray here. This product's current Price in USA is $89.99. The average and highest prices are $89.99 and $89.99 respectively. The current offer price of the product is $94.99.

Lowest Ever Price $89.99
8th Jul 2026
Average Price $89.99
Based on 12 days price tracking
Highest Price $89.99
8th Jul 2026

Price History of All Variants of Vesgantti Large Ottoman for Modular Sofa 29.5...

Current Price in USA

Price $89.99
MRP $99.99
Savings $10.00
Discount 10.00%

Product Information

Details

Product Name Vesgantti Large Ottoman for Modular Sofa, 29.5 inch Corduroy Ottoman with Spring Cushion, Rectangle Foot Rest for Couch, Entrance Footstool with Wood Legs, Footstool for Living Room, Bedroom, Dark Gray
Store Product Code B0FCSB9QBV
Store Name amazon.com
Brand Vesgantti
Rating 8.8 / 10
Category Ottomans
Color 29.5" - Ottoman Dark Gray
Size 29.5" - Ottoman
Dimensions 26.4"D x 29.5"W x 19.7"H

Features

  • Multifunctional Ottoman - A versatile essential crafted for dynamic living. Serve as an entryway footstool, guest seating, plush footrest beside sofas/chairs, or even a bedside perch. Effortlessly blending form and function, its adaptable design elevates entryways, living rooms, and bedrooms alikeideal for modern spaces seeking utility without compromising style
  • FSC Certified Solid Wood - Made with materials from well-managed forests that support sustainable forestry practices. This ottoman for modular sofa is known for its sturdiness and solidity. Additionally, the ottoman pouf features non-slip protective backing on the bottom of the legs, providing stability and preventing damage to flooring
  • Ergonomic & Comfortable - The spring cushions of this ottoman absorb the impact of daily use, preventing rapid wear and tear and extending the life of the footstool. With a 26.4-inch seat depth, its generously sized seat offers ample support for both sitting and propping up feet, enhancing relaxation with exceptional pressure relief that makes every moment feel effortlessly luxurious
  • Durable Corduroy Fabric - This foot rest has a unique pattern and texture, characterised by parallel ridges that give it a smooth and soft feel. The pouf ottoman has a clear and rounded velvet-like surface, which adds to its luxurious appearance. Additionally, our footstool is thick and wear-resistant, making it an excellent choice for those who demand comfort and durability
  • Easy Assembly - Complete with tools and detailed instructions, assembly is quick and easy. Color/size may vary slightly due to display/manual measurement. Upon unpacking, cushions may appear compressed; allow 24-48 hours to fully fluff. Pat gently for faster recovery and enhanced comfort. Contact us with questions

Images

×
Image of Vesgantti Large Ottoman for Modular Sofa, 29.5 inch Corduroy Ottoman with Spring Cushion, Rectangle Foot Rest for Couch, Entrance Footstool with Wood Legs, Footstool for Living Room, Bedroom, Dark Gray
Image of Vesgantti Large Ottoman for Modular Sofa, 29.5 inch Corduroy Ottoman with Spring Cushion, Rectangle Foot Rest for Couch, Entrance Footstool with Wood Legs, Footstool for Living Room, Bedroom, Dark Gray
Image of Vesgantti Large Ottoman for Modular Sofa, 29.5 inch Corduroy Ottoman with Spring Cushion, Rectangle Foot Rest for Couch, Entrance Footstool with Wood Legs, Footstool for Living Room, Bedroom, Dark Gray
Image of Vesgantti Large Ottoman for Modular Sofa, 29.5 inch Corduroy Ottoman with Spring Cushion, Rectangle Foot Rest for Couch, Entrance Footstool with Wood Legs, Footstool for Living Room, Bedroom, Dark Gray
Image of Vesgantti Large Ottoman for Modular Sofa, 29.5 inch Corduroy Ottoman with Spring Cushion, Rectangle Foot Rest for Couch, Entrance Footstool with Wood Legs, Footstool for Living Room, Bedroom, Dark Gray
Image of Vesgantti Large Ottoman for Modular Sofa, 29.5 inch Corduroy Ottoman with Spring Cushion, Rectangle Foot Rest for Couch, Entrance Footstool with Wood Legs, Footstool for Living Room, Bedroom, Dark Gray

Rating and Reviews

8.8 Based on 550 reviews

Vesgantti Large Ottoman for Modular Sofa 29.5 has 8.8 rating out of 10. This average rating is consist of 550 individual ratings. You can rate this product at product review page.

* Predictions is created on based of past prices and trends, it does not guarantee that it will happen. These are just prediction for theoretical information only.